Tuesday, January 9, 2007

Just playing a little...

This is not the concept that Sean is working on, but Tracy had an idea to explore a sea turtle theme a little... This was just me playing a little bit. Our LLC name is Nemo's Coffee, so there will not be 'Tea' in our company name or logo. I just needed another word to balance the composition... I'm just playing in Photoshop for a few minutes for a break from reality.



I have to apply for at least five jobs a week in order to qualify for unemployment benefits. I sent resumes to Intel, Booz Allen Hamilton, DPix, Boeing, and Google today. I posted my resume on-line (Monster.com) several months ago before I knew where we were headed. I have never really looked for a job before, and I expected it to just disappear into a black hole. I got my first call and job offer four hours later, and I have been receiving correspondance from various companies about 2 or 3 times a week. I'm not sure how to conduct a job search to comply with unemployment policies without actually wanting to accept a job anywhere!
Here is my resume (the Word formatting did not copy into the blog, but I'm not going to fix it):

James Dean Anderson II
XXXXXXXXXXXXXXXXXXXXX Colorado Springs, CO 80909
XXX-XXX-XXXX ▪ jdanderson-unem@hotmail.com


PROJECT MANAGER:
Over nine years experience in the Semiconductor Industry, preceded by 12 years experience in the Nuclear Power Industry. I excel in the management and coordination of complex projects, successful in leading both small and large teams. My skill sets include project management, quality assurance, industrial scheduling with Primavera Project Planner, operation and maintenance of complex technical systems, both mechanical and electronic, technical writing, etc.

WORK EXPERIENCE:

FST Technical Services March 2004 to Present
Project Manager
Intel Fab 23, Sustaining Project Manager – Managed the execution of over 500 projects, with individual project budgets varying from $2000, to $20,000,000. Included all aspects of the project from inception, scope and design, funding, execution, certification, and closeout.

Intel Fab 23, P874 Tool Install project. Project Manager for Diffusion, Implant, Wafer Handling, Labs, Defect Metrology, and Thin Films Metrology functional areas. Includes all aspects of construction management and project controls, including Safety, Scope, Schedule, and Budget.

APPLIED MECHANICAL 1997 to 2004
Account Manager / Project Manager
Responsible for all aspects of high-tech construction management including project cost estimating, detailed Scope of Work documents, scheduling, budget tracking, planning and coordination of impacts to manufacturing, and all aspects of management and negotiations with subcontractors.
I have maintained a track record of highly successful projects. Excellent skills in problem solving, communication, document control, and work organization/efficiency. I have been able to build high levels of customer confidence at all projects. I have a thorough understanding of policies and procedures at Intel Fab 23 Colorado Springs, CO.
Recent Projects include Project Manager P874, Project Manager GCP Sustaining Projects at Intel Fab 23, QAR PM for Intel Fab 23 P803 Ramp (completion project), Tool Install PM for Litho, Metrology, and South Support Functional Areas for Intel original P803 Ramp project.

Scheduler, Intel Fab 23
Trained and certified in Primavera Project Planner scheduling and project control software.
Responsible for creating, maintaining, and publishing complex capital expansion project schedules in P3 and Excel formats.
Built new project schedule IAW Intel’s SOP and migrated to new software platform, implementing P3Enterprise at Intel Fab 23, Colorado Springs, CO.

Project Manager, Field Service Engineer, TEL Diffusion Furnaces
Managed a team of six Field Service Engineers in the modification of TEL Alpha 8 Series diffusion furnaces at Micron, Manassas, VA.
Included major refurbishment/replacement of electrical, electronic control, gas distribution, and robotics/automation systems.
Completed all system programming, system testing, and Vendor Qualification of seven units.
Installed, assembled, and completed Vendor Qualification on five 300mm TEL diffusion furnaces at Maxim, Santa Clara, CA.

Project Manager, QAR
Managed projects as the Customer’s QAR Representative at numerous locations including Intel, LSI Logic, Vitesse Semiconductor, Atmel, Symbios Logic, Hewlett Packard, Agilent Technologies, etc.
NDE Level II Certification for Weld Inspection and Mass Spectrometer Helium Leak Detection.
Responsible for work scheduling, estimating job cost, and personnel management.
Responsible for all project reporting and line commissioning matrix and tracking.
Audited and directed the QCR activities of the installing contractors.
Technical writing – wrote detailed work procedures for complex evolutions and testing.

Project Coordinator, Basebuild/Tool Hook-up / Various Sites
Responsible for scheduling, estimating job cost and sub contractor management.
Computed monthly estimates of work completed and approved payment of contractors.
Maintained daily log of construction and inspection activities and evaluated progress reports.
Managed tool sign-off coordination and close-out.
Developed detailed Scope of Work and generated RFP plan / documents.
`
QA/QC: Basebuild/Tool Hook-up CMP / Various Sites
Identified and resolved all field quality assurance issues.
Created and monitored process systems testing schedules.
Conducted NDE weld inspections.
Responsible for the resolution of contractor and client issues.
Completed Line Certification Testing, including pressure decay test, helium leak test, particle count analysis, and trace gas analysis.

US Navy Submarine Service
Newport News Shipyard USS Toledo SSN 769
Certified as Engineering Watch Supervisor, Reactor Operator, Shutdown Reactor Operator.
Quality Assurance Manager, Reactor Controls Division. System Expert for reactor instrumentation and controls equipment.
Hand selected as part of construction and commissioning team, new construction nuclear plant.

Knolls Atomic Power Laboratories S8G Nuclear Prototype
Supervised 40 Reactor Controls Division personnel, in five rotating shifts. Responsible for all documentation and records for Reactor Controls Division.
Responsible for the operation, preventive maintenance, and corrective maintenance of Reactor Instrumentation and Controls equipment.
Technical Writing – wrote 260 page work procedure for the first of a kind S8G platform End of Core Life Testing Program.
Certified Nuclear Instructor. Instructed US Navy and General Electric engineering operators in the theory, construction, and operation of various configuration Reactor Plants.

QUALIFICATIONS:
Over 20 years experience in the Construction Management industry. Skilled in Project Controls Management / Primavera Scheduling
Developed job tracking matrices for Intel and LSI Logic tool install and base build projects.
Extensive experience in the construction, operation, and troubleshooting of bulk gas and specialty gas systems. Proficient in the operation of Praxair, Air Products, and Matheson Gas Cabinets and VMB’s, fully versed in high purity system protocol.
Troubleshooting and identification of contamination source for bulk gas systems.
Supervised Reactor Controls Division personnel in installation certification, operation and maintenance of Reactor Plant Systems.

EDUCATION/TRAINING:

US Naval Nuclear Power School and Nuclear Power Training Unit.
Certified Nuclear Maintenance Technician, Nuclear Instructor and Nuclear Systems Expert.
Electronics Technician – 12 years experience in US Navy
Certified Primavera Project Planner Training (P3).
NDE Level II Non-destructive Examination; NDE Level II Mass Spectrometer Leak Detection
AMI Certified Orbital Welder; George Fischer Certified Weld Inspector and Level I Installer, IR-63 and IR-225 Process; Swagelok Component Certification.
Fully proficient in the use of Helium Leak detectors, Condensate Nucleus and Laser particle counters, and Trace Gas analysis equipment.

No comments: